8-Lane Highway Expansion on NH-3
(Vadape to Thane)
- Home
- Case Study 2
Project Overview
MSRDC Infrastructure Projects Limited undertook the ambitious construction of 8-laning of the existing 4-lane Vadape to Thane section from Km 539.202 to Km 563.000 on NH-3 (New NH-848) in Maharashtra, executed on Hybrid Annuity Mode. This critical infrastructure project required high-performance concrete solutions for both structural and pavement quality work.
Client Requirements
The project demanded reliable admixtures and curing compounds that could meet stringent quality standards for highway construction while ensuring durability under heavy traffic loads and varied weather conditions. The contractor, Lion Engineering Consultants Pvt. Ltd. and Fortress Infracon Limited, required a certified supplier with proven credentials.
SCS Solution Implemented
- High-performance concrete admixtures for structural work
- Specialized curing compounds for pavement quality concrete
- Technical support throughout the project duration
Results & Benefits
- Regulatory Compliance: Full approval from MSRDC Infrastructure Projects Limited for use across all structural and pavement work
- Quality Assurance: Products met rigorous highway construction standards for durability and performance
- Project Scale: Successfully supplied materials for a 23.8 km highway expansion project
- Technical Support: Provided dedicated engineering support to ensure optimal concrete performance throughout the construction phase
All Projects
Get a Quote Today for Your new project!
Quick Contact
Super Concrete Solutions delivers customized construction chemicals for India’s growing building industry. We have grown into a trusted manufacturer serving builders, contractors, and infrastructure developers nationwide.
© 2025 All rights reserved
- Privacy Policy
- Terms & Conditions
